Peachtree Corners Town Center

Peachtree Corners Town Center
Peachtree Corners Town Center
Peachtree Corners Town Center
Peachtree Corners Town Center
Peachtree Corners Town Center
Peachtree Corners Town Center

Project Description

Client: Downtown Development Authority of the City of Peachtree Corners
Location: Peachtree Corners, Georgia
Surface Area: 15 acres
Year Completed: 2018
Value: $4,667,400
Architect: Haynes Gipson & Associates

Peachtree Corners Town Center

Serving one of Atlanta’s most affluent trade areas, Peachtree Corners Town Center will be a 21-acre, premier mixed-use development with a theatre, shops, chef driven restaurants, municipal parks, an integrated pedestrian trail system and an upscale townhome community. The project is located at the corner of Peachtree Parkway and Medlock Bridge Road in the city of Peachtree Corners.

Eagle Excavation performed all the site work including clearing, erosion control, underground detention vaults, detention ponds, grading, storm, sewer and water systems. curb, paving, striping and traffic signals.

Project Typhoon

Project Description

Client:  Evans General Contractor
Location:  Midway, GA
Surface Area: 15 acres
Year Completed: 2012
Value: $446,026
Engineer:  Thomas & Hutton Engineers

Project Typhoon

Project Typhoon is a 30,000 square foot expansion to existing Firth Rixson Forging Facility. Project Included a 36-foot-deep excavation with a shoring and well-point dewatering system. 20,000 cubic yards were hauled and stockpiled off site and hauled back and compacted. Project included clearing, demolition, sanitary, storm and water system. Challenges included a high water table and keeping existing facility functional during construction.

Sugarloaf Marketplace

Project Description

Client:  Fuqua BCDC, Sugarloaf, LLC
Location:  Duluth, GA
Surface Area:  30.75 acres
Year Completed:  2016
Value:  $4,680,000
Architect:  Haines Gibson & Associates

Retail urban project consist of 40,000sf of mixed-use retail that includes a bank, restaurants, and retail shops. It is located at the convergence of two major though fares, Scott Blvd and N. Decatur Road in Decatur. Dynamic Decatur is on of Atlanta’s premier in-town residential districts.

Eagle Excavation performed all the sitework including clearing, erosion control, underground detention vaults, bio-retention ponds, grading, storm, sewer and water systems. curb, paving, striping and traffic signals.

The First Step In Your Project Development.

Capital Club at Godley Station

Project Description

Client:  Choate Construction
Location:  Savannah, GA
Surface Area:  25 acres
Year Completed:  2014
Value:  $2,171,863
Architect:  Thomas & Hutton

This master-planned, gated 256-unit Class A multi-family development is located on 25 acres in Savannah off Pooler Parkway. Eagle Excavation performed all site work including clearing, grading, sanitary, storm, water and stone paving.

Capital Club at Godley Station is a 256-unit Class A multifamily development located in the high growth corridor of the Pooler submarket in Savannah, Georgia. Capital Club resides in a prime suburban location just minutes west of the Savannah International Airport at the intersection of Benton Blvd and Pooler Parkway. From spacious walk-in closets to open island kitchens, Capital Club’s well designed 1, 2, and 3 bedrooms  benefit from upscale features and market leading amenities that will differentiate it from other garden projects.

The community showcases a spectacular salt water pool, a high-tech sports club, and outdoor areas featuring cabanas, grills and fireplaces. The residents will enjoy the superb location within Godley Station’s master planned community with some of the best access to nearby retail and employment in all of Savannah. Visit our website at www.capitalclubsavannah.com.