Project Description

Client: Downtown Development Authority of the City of Peachtree Corners
Location: Peachtree Corners, Georgia
Surface Area: 15 acres
Year Completed: 2018
Value: $4,667,400
Architect: Haynes Gipson & Associates

Peachtree Corners Town Center

Serving one of Atlanta’s most affluent trade areas, Peachtree Corners Town Center will be a 21-acre, premier mixed-use development with a theatre, shops, chef driven restaurants, municipal parks, an integrated pedestrian trail system and an upscale townhome community. The project is located at the corner of Peachtree Parkway and Medlock Bridge Road in the city of Peachtree Corners.

Eagle Excavation performed all the site work including clearing, erosion control, underground detention vaults, detention ponds, grading, storm, sewer and water systems. curb, paving, striping and traffic signals.

Overlook at Twin Lakes

Project Description

Client: Brand Properties, LCC
Location: Peachtree Corners, Georgia
Surface Area: 14 acres
Year Completed: 2018
Value: $1,495,681
Architect: Planner & Engineers Collaborative

Overlook at Twin Lakes is a mixed commercial and residential project featuring a 295-unit high-end housing complex designed to target professional millennials. The 39-acre development on the shores of two lakes in Technology Park in Peachtree Corners features “resort-style” amenities including a pool, boat dock, hiking/biking trail, cyber café, fitness facilities and a dog park.

Eagle Excavation performed all the site work including erosion control, storm capture underground detention system, grading, storm, sewer and water system.

Project Typhoon

Project Description

Client:  Evans General Contractor
Location:  Midway, GA
Surface Area: 15 acres
Year Completed: 2012
Value: $446,026
Engineer:  Thomas & Hutton Engineers

Project Typhoon

Project Typhoon is a 30,000 square foot expansion to existing Firth Rixson Forging Facility. Project Included a 36-foot-deep excavation with a shoring and well-point dewatering system. 20,000 cubic yards were hauled and stockpiled off site and hauled back and compacted. Project included clearing, demolition, sanitary, storm and water system. Challenges included a high water table and keeping existing facility functional during construction.

FedEx Bloomingdale

Project Description

Client: Satterfield & Pontikes Construction
Location: Bloomingdale, GA
Surface Area: 26 acres
Year Completed: 2016 (expected)
Value:  $2,343,192
Engineer: Coleman & Co Engineering

New FedEx Freight distribution facility. Eagle Excavation contracted to perform erosion control, clearing, grading, storm, sewer and water systems and GAB for asphalt paving.

Let the Pro’s at Eagle Excavation Get Your Project Started Right.

St. Anne’s Catholic Church

St Anne's Catholic Church
St Anne's Catholic Church
St Anne's Catholic Church
St Anne's Catholic Church
St Anne's Catholic Church
St Anne's Catholic Church
St Anne's Catholic Church
St Anne's Catholic Church
St Anne's Catholic Church
St Anne's Catholic Church

Project Description

Client:  RW Allen, LLC
Location:  Richmond Hill, GA
Surface Area:  5.5 acres
Year Completed:  2016
Value:  $869,000
Architect:  The Boudreax Group

The new St. Anne’s Church has a 26,000 sq ft sanctuary and comfortably seats more than 900 parishioners for Mass. Eagle Excavation provided demo, clearing, grading, erosion control, underground utilities, curbs, sidewalks, paving and landscaping for the project.

Sugarloaf Marketplace

Project Description

Client:  Fuqua BCDC, Sugarloaf, LLC
Location:  Duluth, GA
Surface Area:  30.75 acres
Year Completed:  2016
Value:  $4,680,000
Architect:  Haines Gibson & Associates

Retail urban project consist of 40,000sf of mixed-use retail that includes a bank, restaurants, and retail shops. It is located at the convergence of two major though fares, Scott Blvd and N. Decatur Road in Decatur. Dynamic Decatur is on of Atlanta’s premier in-town residential districts.

Eagle Excavation performed all the sitework including clearing, erosion control, underground detention vaults, bio-retention ponds, grading, storm, sewer and water systems. curb, paving, striping and traffic signals.

The First Step In Your Project Development.

Quala Wash Facility

Project Description

Client:  Evans General Contractors
Location:  Garden City, GA
Surface Area:  12 acres
Year Completed:  2015
Value:  $2,198,219
Engineer: Thomas & Hutton Engineering

Quala’s facility boasts four technologically advanced and environmentally sound chemical cleaning bays, two sophisticated food grade wash bays, and four maintenance bays. More than 6,900 square feet of office space is available for lease, and 2,152 square feet is devoted to the truck drivers’ lounge, break room and rest rooms.

The vat-style wash system was built to Quala specifications. Boilers supply enough steam to handle up to 12 tanks at a time.

The Savannah location handles tank trailers and tank containers and has ample room for tank container storage.

Eagle’s construction challenges included the relocation of over 60,000 cy of buried wood chips and construction debris and replacement with imported select fill during an exceptionally rainy/wet year. Despite this challenge Eagle Excavation was able to bring this project in on schedule.

A Successful Project Starts With Eagle Excavation.

GSU Football Operations Facility

GSU Football Operations Facility
GSU Football Operations Facility
GSU Football Operations Facility
GSU Football Operations Facility
GSU Football Operations Facility
GSU Football Operations Facility
GSU Football Operations Facility
GSU Football Operations Facility
GSU Football Operations Facility
GSU Football Operations Facility
GSU Football Operations Facility
GSU Football Operations Facility
GSU Football Operations Facility
GSU Football Operations Facility
GSU Football Operations Facility
GSU Football Operations Facility
GSU Football Operations Facility

Project Description

Client:  Evans Construction
Location:  Statesboro, GA
Surface Area:  2 acres
Year Completed:  2014
Value:  $686,889
Architect:  Rosser International, Inc.

$10 million privately funded Ted Smith Family Football Center provides space for the essential functions of the Eagle Football program in one central location. The 50,000-sq. foot building, located between the east end zone and Lanier Drive, contains locker rooms, meeting spaces, coaches’ offices, a strength and conditioning center, athletic training facility and equipment room. In addition to serving as the day-to-day center for the team, the facility also includes a large Hall of Fame exhibit area that displays the program’s history and honor Georgia Southern legends. Eagle Excavation provided the site work for this challenging project.

Shaping the Future One Site at a Time.

Cumming Town Center

Project Description

Owner:  Sembler Family Partnership
Location:  Cumming, GA
Surface Area:  50 acres
Year Completed:  2008
Value:  $10, 087,672
Engineer:  Haines Gibson & Associates

The Cumming Town Center project is a 50-acre site multi-tenant shopping center. Eagle Excavation handled all site development services including grading, pipe installation, modular walls, curb base and paving.

Deerfield Place

Project Description

Owner:  Sembler Alpharetta LLC
Location: Milton, GA
Surface Area: 49 acres
Year Completed: 2009
Value: $11,221,324
Engineer:  Haines Gibson & Associates

Deerfield place is a 49-acre Target and Kohl’s anchored Shopping Center. Grading, pipe installation, modular walls, traffic signalization, curbing and asphalt paving were provided.

“I have worked with Eagle Excavation, Inc. professionally for over eight years. Eagle Excavation has always exhibited excellent knowledge in technical issues, construction means and methods, and constructability issues. I heartily recommend Eagle Excavation, Inc. They have been one of the best contractors, I have worked with and I personally look forward to working with them again in the future.”

Stoney C. Abercrombie - P.E. Associate Haines, Gipson & Associates Consulting Engineers